• CWA - LinkedIn
  • CWA - Facebook
  • CWA - Twitter
Intelligent Engineering
CWA Engineering - Chevin Housing - Stuctural & Civil Engineering
CWA Engineering - Chevin Housing - Stuctural & Civil Engineering
CWA Engineering

Cressy Field Extracare Centre

This extracare development in Derbyshire consists of 52 apartments with associated communal facilities.
  • Client:
    Chevin Housing / Willmott Dixon

  • Location:
    Derbyshire

  • Project Value:
    £6,000,000

  • Services Provided:
    Civil and Structural Engineering Consultancy
Description

The four and five storey building is constructed from load bearing masonry with precast floors, posi joist flat roof and traditional concrete strip and pad foundations. The cramped site presented challenges with regard to external works and foundation designs given the 8m cross fall from boundary to boundary. The project was designed in a Level II BIM Model involving the Architectural, Structural and M&E disciplines. This allowed the design team to identify and resolve all issues of coordination between trades prior to the construction phase.

Related Projects
Swadlincote Extracare Village
Swadlincote Extracare Village
This joint venture project was commissioned by Derbyshire County and District Council, together with...
Read More
Granville Lofts, Birmingham
Granville Lofts, Birmingham
This seven storey apartment block consists of 119 new homes constructed on a long...
Read More
The Helix, Bristol Road – Student Accommodation
The Helix, Bristol Road – Student Accommodation
The building is approximately 108,500 sq ft of floor area, this includes 350 bed...
Read More
    • Thank you @yourseddon for your great drinks event in Birmingham last night. Great food and company!
    • RT @Tom_Hender: Excited to see work starting ⁦@CWA_Eng⁩ designed Office-to-Resi conversion ⁦…
    • RT @RSKGroup: Having recently passed her exams to become a chartered member of the @ICE_engineers, Olivia Plunkett, principal ci…