• CWA - LinkedIn
  • CWA - Facebook
  • CWA - Twitter
Intelligent Engineering
Merlin - Industrial - CWA - Eng

Merlin Park – Phase 2

This project was phase 2 of an industrial development with an overall floor area of circa 450,000 sq ft. The unit comprised 120,000 sq ft of floor space with associated loading bays and trailer park.
  • Client:
    Richardson Developments

  • Location:
    Erdington, Birmingham

  • Project Value:
    £8,000,000

  • Services Provided:
    Civil and Structural Engineering Consultancy

  • Added Value:
    Extensive ground modelling and the use of lime stabilisation minimised disposal of materials off site and maximised the developable area available.

  • PDF Download:
    Merlin Park – Phase 2
Description

The high bay warehouse included an FM2 floor slab with specialist racking installation, along with a two storey element which housed welfare facilities for staff and drivers.

The site had a number of challenges associated with its development including major service diversions, flood plain alleviation and canal retention.

For further information please contact Dave Copeland, Project Director.

Related Projects
Zip Textiles, Birmingham
Zip Textiles, Birmingham
The project was constructed as a two phase development. Phase 1 was constructed in...
Read More
Remote Applications in Challenging Environments (RACE)
Remote Applications in Challenging Environments (RACE)
The steelwork framed building will enable RACE to conduct R&D into many applications of...
Read More
London Taxi Company, Ansty Park, Coventry
London Taxi Company, Ansty Park, Coventry
The facility will be responsible for the production of the new hybrid powered taxi,...
Read More
    • Thank you @yourseddon for your great drinks event in Birmingham last night. Great food and company!
    • RT @Tom_Hender: Excited to see work starting ⁦@CWA_Eng⁩ designed Office-to-Resi conversion ⁦…
    • RT @RSKGroup: Having recently passed her exams to become a chartered member of the @ICE_engineers, Olivia Plunkett, principal ci…