• CWA - LinkedIn
  • CWA - Facebook
  • CWA - Twitter
Intelligent Engineering
CWA Engineering - Chevin Housing - Stuctural & Civil Engineering
CWA Engineering - Chevin Housing - Stuctural & Civil Engineering
CWA Engineering

Cressy Field Extracare Centre

This extracare development in Derbyshire consists of 52 apartments with associated communal facilities.
  • Client:
    Chevin Housing / Willmott Dixon

  • Location:
    Derbyshire

  • Project Value:
    £6,000,000

  • Services Provided:
    Civil and Structural Engineering Consultancy
Description

The four and five storey building is constructed from load bearing masonry with precast floors, posi joist flat roof and traditional concrete strip and pad foundations. The cramped site presented challenges with regard to external works and foundation designs given the 8m cross fall from boundary to boundary. The project was designed in a Level II BIM Model involving the Architectural, Structural and M&E disciplines. This allowed the design team to identify and resolve all issues of coordination between trades prior to the construction phase.

Related Projects
Avon Court Extracare Centre
Avon Court Extracare Centre
The three storey building is constructed of load bearing masonry with precast concrete floors,...
Read More
Burcot Grange Care Home, Bromsgrove
Burcot Grange Care Home, Bromsgrove
The development is situated off Greenhill in Burcot, Bromsgrove and comprises a new 54-bedroom...
Read More
The Lansdowne
The Lansdowne
The project includes a block of 206 high-end apartments close to Five Ways in...
Read More
    • RT @AssociatedA: The @ThomasTUTC extension tops out. The 3-storey, £12.6 million extension houses a 4,500sq.m teaching building, spo…
    • RT @p_hutt: Cllr Carol Hart - Cabinet Member for Health & Communities @Derbyshirecc with Robert Stobo - Project Manager…
    • Fantastic project to be working on