• CWA - LinkedIn
  • CWA - Facebook
  • CWA - Twitter
Intelligent Engineering
Kettering_Buccleuch_Academy-External
Kettering Buccleuch Academy - Education - CWA - Eng

Kettering Buccleuch Academy

Kettering Buccleuch Academy is a £26m 'all through' Academy, catering for students from foundation to extended learning stage. It has co-located three existing schools into a single point of learning.
  • Client:
    Northamptonshire County Council

  • Location:
    Kettering, Northampton

  • Project Value:
    £26,000,000

  • Services Provided:
    Civil and structural engineering

  • Added Value:
    The surface water drainage design incorporates deep borehole soakaways into the fractured limestone aquifer, which has provided an economic and environmentally beneficial solution. The occupier will continue to reap rewards for the lifetime of the building due to a reduction in water company charges as there is no discharge of run off to the public drainage system.

  • PDF Download:
    Kettering Buccleuch Academy
Description

The construction adopted was a two and three storey steel frame with exposed precast concrete floors and roof. The development boasts considerable sustainable credentials, utilising natural ventilations, exposed concrete soffits for thermal massing, high levels of natural lighting and an economic SUDS drainage solution which discharges directly into a fractured limestone aquifer running beneath the site.

Related Projects
Landau Forte Academy – Post 16 Centre, Tamworth
Landau Forte Academy – Post 16 Centre, Tamworth
The two storey steel framed structure supports exposed precast concrete plank floors and roofs,...
Read More
Falcons Free School (Phase 1 & 2), Leicester
Falcons Free School (Phase 1 & 2), Leicester
Phase 1 The refurbishment of an existing listed building, including the removal of load bearing walls...
Read More
Park Hill Primary School, Coventry
Park Hill Primary School, Coventry
The primary structure consists of a braced steel frame with a suspended precast concrete...
Read More
    • RT @AssociatedA: The @ThomasTUTC extension tops out. The 3-storey, £12.6 million extension houses a 4,500sq.m teaching building, spo…
    • RT @p_hutt: Cllr Carol Hart - Cabinet Member for Health & Communities @Derbyshirecc with Robert Stobo - Project Manager…
    • Fantastic project to be working on